AGGREGATE HOLDING HOPPER AND WEIGHING BINS
CEMENT,WATER AND ADDITIVE WEIGHING HOPPERS
PNEUMATIC EQUIPMENTS
BUTTERFLY VALVES
LOADCELLS AND CONTROL UNITS
VIBRATORS
DISCHARGE CHUTE AND RUBBERS
OTHER EQUIPMENTS
WEIGHING SYSTEMS
The weighing system mainly includes four parts,the cement weighing system, powder weighing system, water weighing system, and additive weighing system.
AGGREGATE HOLDING HOPPER
This holding hopper facilitates storing of weighed aggregate Transferred by the inclined conveyor from the weight beltconveyor.
The aggregate gate is discharged to the mixer by a Pneumatic gate.
The aggregate gate is discharged to the mixer by a Pneumatic gate.
CEMENT WEIGH HOPPER
This cement weigh hopper is located on top of mixer and suspended on load cells fixed to a rigid structure above the mixer platform.
An electric vibrator assists the flow of cement to the mixer by gravity.
An electric vibrator assists the flow of cement to the mixer by gravity.
WATER WEIGH HOPPER
This water hopper is located on top of mixer and Suspended on load cells fixed to a rigid structure Above the mixer platform.
ADMIXTURE PUMPING, WEIGHING AND DISPENSING SYSTEM
This admixture unit is located on top of mixer and suspended on load cells fixed to a rigid structure above the platform.
This admixture system consists of gear pump and pneumatic dispensing system.
This admixture system consists of gear pump and pneumatic dispensing system.